Plumbing rules in Sydney, a guide by DottoSix tags, from licence to label

Tag 02 · The certificate

The plumbing compliance certificate, field by field

When plumbing or drainage work is finished in NSW, the plumber or drainer must complete a Certificate of Compliance and give a copy to the person who arranged the work, whether that is the owner or a builder. It confirms the work complies with the plumbing laws and standards, and it names that plumber as the responsible person, so it is worth reading line by line and keeping.

General information, not legal or technical advice. The official source is Building Commission NSW’s page on plumbing inspection documents.

02-A · Which form

One certificate, more than one way of lodging it

The certificate confirms the work complies with the Act, the Regulation, the Plumbing Code of Australia and the Deemed-to-Satisfy requirements of AS/NZS 3500. In Sydney, for work that needs an inspection, the plumber submits it to Building Commission NSW through the MyInspections Gateway; for work that does not need an inspection, the plumber can use the Combined Notice of Work and Certificate of Compliance, and does not have to send a copy to the regulator.

Building Commission NSW’s plumbing and draining questions page gives examples of the minor work that form suits. The combined form is the one the regulator publishes as a download, so it is the one read below.

02-B · The form

Reading the owner’s copy

This is a redrawing of the certificate part of Building Commission NSW’s combined form, with the fields in the order the form gives them. The numbered notes beneath it say what each part means for you.

Certificate of Compliance
for plumbing and drainage work

Owner’s copy · Serial number 1

2Property and owner details

House numberStreetSuburbPostcode
Lot numberDP numberPDP or SPNearest cross streetMunicipality / shire
Owner’s nameFull address

3Licensee’s details

Full nameAddress for noticesPhone number
Qualified supervisor number and expiry dateLicence number and expiry date

4Work of water supply

  • Install water supply
  • Install irrigation system
  • On-site alternative water services
  • Install, commission or maintain a thermostatic mixing valve
  • Connection to water supply
  • Install, alter, disconnect or remove a backflow prevention device
  • Other

Plumbing work to comply with: AS/NZS 3500 · Alternative solution · Combined

5Sanitary plumbing and drainage

  • Carry out work of sanitary plumbing or drainage
  • Connection to sewer
  • Sewer disconnection
  • Carry out trade waste drainage
  • Other

Drainage work to comply with: AS/NZS 3500 · Alternative solution · Combined

6Inspection fee and dates

Date fee paidDate work beganEstimated completionAmount and reference number

7The licensee certifies

i. corresponds to the notice of work · ii. tested and passed · iii. notice of pre-existing defects given: Yes / N/A · iv. complies with the relevant Acts, Regulations, Codes and Standards · v. date completed, signature

8The two-year undertaking

The licensee’s promise to fix defects the regulator traces to their work.

Redrawn for this guide from the Combined Notice of Work and Certificate of Compliance (Building Commission NSW, file last updated 12 June 2025). Field names shortened in places; not a form you can use.
  1. 1

    The serial number

    The notice of work the plumber fills in before starting and the certificate at the end are numbered to match: the notice says the corresponding numbered certificate must be submitted to the regulator after the final inspection. The form prints three copies of the certificate, marked for the regulator, the licensee and the owner.

  2. 2

    Property and owner details

    The street address, the lot and plan numbers, the nearest cross street and the council area, then the owner’s name and address. Check it names your property: a certificate is about one address.

  3. 3

    Licensee’s details

    The form asks for a qualified supervisor number and a licence number, each with an expiry date. Both can be looked up on the NSW Government’s online licence check, which shows a licence’s categories, expiry date and current status. Tag 01 covers what to read there.

  4. 4

    Work of water supply

    Tick boxes and a full description. Two of the boxes point to other rules: a thermostatic mixing valve, and a backflow prevention device. In Sydney, Sydney Water keeps a register of installed testable backflow devices, and medium and high hazard devices are tested every year (see Tag 05). The line beneath says what the plumbing complies with: AS/NZS 3500, an alternative solution, or a combination.

  5. 5

    Sanitary plumbing and drainage

    The same pattern for the waste side: sanitary plumbing or drainage, a connection to the sewer, a sewer disconnection, trade waste drainage, or other. After drainage work the plumber or drainer must also give you a Sewer Service Diagram, which shows where the private sewer pipes run.

  6. 6

    Fee and dates

    The inspection fee details, the date work began and the estimated completion date, with the contractor’s signature.

  7. 7

    What the licensee certifies

    Five statements: the work corresponds to the notice of work; it has been tested as the regulator requires and passed; where section 11 of the Plumbing and Drainage Act 2011 requires it, written notice has been given of any pre-existing defective plumbing or drainage they found (ticked Yes or N/A); the work complies with the relevant Acts, Regulations, Codes and Standards; and the date the work was completed.

    If item iii is ticked Yes, a written notice about those defects should come with the certificate; the duty behind it is explained on Building Commission NSW’s questions page.

  8. 8

    The two-year undertaking

    The last clause is the one most worth keeping the paper for. If a defect is found in the licensee’s work within two years of the final inspection, or within a time the regulator specifies, and the regulator certifies in writing that it is due to faulty workmanship or defective materials, the licensee undertakes to fix it at their own expense if the regulator directs them to.

02-C · Gas

Gas work comes with its own paper

A plumbing certificate does not cover gas. After any gas work, the licensed gasfitter has to hand you a certificate of compliance for network gas, or a certificate of inspection for bottled gas. The NSW Government says these confirm that a licensed gasfitter completed work that complies with the relevant industry standards, and that the certificate must include the licensee’s name and licence number.

02-D · If it is missing

When the paperwork does not arrive

The plumber left part way through

A plumber who stops working on a job must submit a Certificate of Compliance and Sewer Service Diagram for the work they did.

Earlier work was never inspected

Where a plumber finds that earlier work on a property was not arranged for inspection, Building Commission NSW’s advice is for the owner or builder to make a complaint, with emails, texts or invoices that show who did the work.

A diagram drawn after the fact

If a plumber later draws a Sewer Service Diagram for a property that was never inspected, the regulator stamps it: “This property has not been inspected by the Regulator at the time of installation. Plumbing and drainage present at this property may or may not comply with the Plumbing Code of Australia and relevant Australian Standards.” For a buyer, that second sentence is the one to read slowly.

Unpaid bills and sales with no diagram on file are answered on Building Commission NSW’s plumbing and draining questions page.

02-E · Keeping it

Where the copies live

Keep the owner’s copy with the invoice. Building Commission NSW’s page on plumbing inspection documents says where older Sewer Service Diagrams are held. The certificate itself names the person responsible for the work, which is the fact you will want if anything goes wrong inside the two years.